FY 17 Bridge Replacement Projects, Batch 1, P.I. No. 0015523 – Districts 2, 3, & 6, GA

This design-build bridge replacement project consisted of replacing seven structurally deficient bridges on off-system routes. The typical structures consisted of precast, prestressed concrete superstructure supported on driven pile bents to minimize impacts to waterways and improve the speed of construction. The project included the preparation of a U.S. Army Corps of Engineers 404 Permit for each crossing. ICE served as the Lead Design Consultant responsible for design management, roadway design, hydraulic/hydrological design, bridge design, geotechnical design, and utility coordination.