This project includes constructing a new roundabout-controlled diamond interchange (overpass bridge) located east of the existing weigh station on I-16 and realigning and widening Old Cuyler Road and Cuyler Road over I-16 from two lanes to four lanes with a 10′ raised median. A new bridge is being constructed with four lanes, two 12′ lanes for northbound traffic and two 12′ lanes for southbound traffic, separated by a 10′ raised median and a 6.5′ pedestrian sidewalk on either side. The project limits begin east of the I-16 Frontage Road from US 280/SR 30 to near CR 11/Jernigan Road (P.I. No. 0019452), where Cuyler Road will tie into the Frontage Road. The total project length is approximately 4.1 miles.
ICE served as the Lead Design Consultant responsible for overall design project management, roadway design, bike/pedestrian facilities design, hydraulic/hydrological design, bridge design, traffic operations design, and geotechnical design.