This design-build project consists of the design and construction services necessary to widen US 280 from two lanes to four lanes with a median between Olive Branch Road and Oracal Parkway for approximately 2.2 miles. The work also includes designing and constructing five multi-lane roundabouts where US 280 intersects with Oracal Parkway, Frontage Road, Dillon Drive, and the I-16 Westbound and Eastbound ramps.
ICE served as the Lead Design Consultant responsible for overall design project management, roadway design, bike/pedestrian facilities design, hydraulic/hydrological design, geotechnical design, traffic operations design, utility coordination, environmental compliance, and environmental services.