This design-build project consisted of the replacement of Callie Johnson Road Bridge over Zig Zag Creek. ICE provided preliminary road and bridge design, hydrology design calculations, geotechnical report, surveys, and contractor quality control. Additionally, the scope of work included identifying utilities and verifying existing right-of-ways early to avoid delays during construction. Prior to demolition and construction, the project area was detoured. Construction proceeded expeditiously to minimize disruption to the community, motoring public, and the environment. The final bridge consisted of a hollow-core slab bridge. The total length of the bridge is approximately 85ft which includes 2 spans.