Design-Build Engineering

Overlapping the design and construction phases of a project can greatly reduce the delivery schedule and project costs and minimizes the risks for the project owner. ICE has teamed with several of the industry’s leading contractors on recent Design-Build projects including Bridge Replacement Packages C, D, & E (24 bridges total), Palmetto Commerce Parkway Phase II, SC 150 Emergency Bridge Replacement, Johnnie Dodds Boulevard Improvements, and the recently completed Perryclear Bridge Replacement project.